
Kitchens, baths, basements, whole homes.
Major remodels managed like a new build: real drawings, line-item pricing, and a crew that shows up when we say.
Overview
A remodel run like a new build.
Remodeling an occupied home takes planning. We order long-lead items before demo, protect the rest of the house, and keep a schedule you can plan your life around.
Whether it's a cabinet refresh or gutting the whole first floor, you'll get drawings, a selections list, and a price before we start.


Basements & spaces to gather
Make the most of
what’s downstairs.
A room for games. A place for guests. A wet bar that brings everyone together.
Start with how you want to use the space, then work through layout, ceiling heights, lighting, moisture conditions, plumbing, and any required egress or structural work.
Plan your basementPricing
What a renovation costs
Illustrative planning ranges from our price guide. Your written proposal defines the scope, allowances, exclusions, and current pricing for your project.
Kitchen refresh
New surfaces and fixtures in the footprint you have.
- Cabinet replacement or refacing
- Quartz or solid-surface tops
- Tile backsplash
- Lighting and plumbing fixtures
Full kitchen remodel
New cabinets, an island, and a layout that works.
- Semi-custom cabinetry and island
- Moved plumbing and electrical
- New flooring and lighting plan
- Appliance package coordination
Showpiece kitchen
Open the floor plan and build the kitchen you've pinned for years.
- Wall removal with beams
- Custom cabinetry and built-ins
- Pantry, coffee bar, or wet bar
- Premium appliances and stone
See the difference
Three ways to rethink the kitchen.
Your layout and selections shape where the project sits.
The colored band shows the planning range. Illustrative figures only; final scope and pricing are confirmed in writing.
Detailed project pricingView figures & assumptions
| Project | Typical range | Typical time |
|---|---|---|
| Hall bathroom | $15k – $30k | 3–5 wks |
| Primary bathroom | $35k – $75k | 5–8 wks |
| Kitchen refresh | $25k – $45k | 4–6 wks |
| Full kitchen remodel | $50k – $95k | 6–10 wks |
| Basement finish | $35 – $75 / sq ft | 6–10 wks |
| Porch rebuild | $15k – $55k | 3–6 wks |
| Whole-home renovation | $75 – $175 / sq ft | 3–6 mo |
Older homes can hide surprises behind the walls. We include a contingency line in every remodel estimate so there's a plan for them.
Budget breakdown
Where a kitchen budget goes
An illustrative mix to show the moving parts. Your project’s allocation will differ.
Select a category below to see its share.
What's included
Every Dailey renovation includes
-
Measured drawingsSo everything fits the first time.
-
Selections listEvery finish chosen before demo.
-
Dust protectionPlastic walls and floor protection.
-
Licensed tradesElectrical and plumbing to code.
-
PermitsFiled when the work requires it.
-
Daily clean-upA work site you can live next to.
Timeline
Renovation timeline
-
Week 1
Walk-through
See the space and talk goals.
-
2–4 weeks
Design & selections
Drawings, finishes, and price.
-
2–6 weeks
Order materials
Cabinets and long-lead items arrive before demo.
-
3–10 weeks
Demo & build
Rough-ins, inspections, and finishes.
-
Final days
Final walkthrough
Punch list and clean-up.
Illustrative sequence only. Timing depends on scope, approvals, weather, material availability, and selections.
Project photos
Recent renovations work
How do I keep a remodel on budget?
A clear scope and early selections are two of the most useful ways to keep a remodel focused. We help work through the layout, materials, fixtures, and priorities before demolition so the budget reflects the project you actually want.
Existing homes can also reveal conditions that were not visible at the start. When a discovery or requested change affects the work, we discuss the options and cost implications so you can make an informed decision.
Can we stay in the house during a kitchen remodel?
Often you can, depending on the extent of the work and your household's needs. We talk through which parts of the home will remain usable, how the work area will be separated, and what a temporary kitchen setup might involve.
We also discuss access and expected water or power interruptions before demolition. If a stage is likely to be especially disruptive, we help you understand the timing so you can decide what arrangements will be most comfortable.
Do you finish basements with egress windows?
Yes, egress work can be included as part of a basement project. We first consider how you want to use the space, then review the existing foundation, window locations, exterior access, drainage, and applicable requirements.
We plan the window and well together with the room layout so the result feels integrated into the finished space. The final approach depends on the property and design, which we review before establishing the construction scope.
Do you do smaller jobs?
Our focus is larger renovations and coordinated projects, typically above $15,000, where planning and managing the work together makes the greatest difference. Kitchens, baths, basements, and broader updates are common starting points.
If you are unsure whether your project fits, send a short description and a few photos. We can discuss the scope and, when appropriate, point you toward a better next step for a smaller repair.
Let's build something beautiful together.
Our Cardington office is open by appointment, so every visit gets our full attention. Call, email, or send the project form and we'll set a time to meet at the office or on your land.
614.202.7220
